Chadwick Geotechnics, a subsidiary of Tonkin + Taylor Group, undertook all the drilling and test pitting for the initial geotechnical investigation of footings and pavements. A dedicated team of NATA-registered site testing professionals then conducted quality control testing on subgrades and pavements, proof rolling inspections, performed plate load testing when necessary, and conducted foundation inspections for each footing throughout the construction period, helping maintain construction quality and support reliable footing and pavement performance.
The project highlights included installing 149 wind turbines, constructing 110 kilometres of internal access roads, and managing complex geology, all while supporting the project’s delivery.
In response to the project’s technical requirements, the team conducted geotechnical and hydrogeological investigations, designed full gravity, anchored, and hybrid footings, provided geotechnical advice for four substations, used Plaxis 3D modelling for foundation analysis, developed innovative and sustainable pavement designs, guided subgrade improvements and winter construction, prepared earthworks specifications and technical advice, provided laboratory services, and performed pavement analysis for heavy components and crane lifts.

Services

  • Geotechnical + hydrogeological investigations
  • Drilling + test pitting
  • Design of footings
  • Construction support
  • 3D modelling of foundations
  • Pavement designs 
  • Subgrade improvements 
  • Earthworks specifications + technical advice
  • Laboratory services
  • Crane lift studies

Client

  • Goldwind Australia Pty Ltd

Year

  • 2018-2020

Through our comprehensive range of services and technical expertise, Chadwick Geotechnics and Tonkin + Taylor made a significant contribution to the successful execution of the project. The team’s commitment to quality control, geotechnical design, and pavement analysis ensured the construction of reliable and efficient infrastructure for the wind turbine installation, supporting the project’s successful execution.

Explore More Projects

City Rail Link

City Rail Link

Northern Expressway, Pūhoi to Warkworth

Northern Expressway, Pūhoi to Warkworth

Northern Canterbury Transport Infrastructure Recovery

Northern Canterbury Transport Infrastructure Recovery

previous arrow
next arrow

How can we help?

Get in touch with a Tonkin + Taylor representative today. Our friendly and knowledgeable team make it easy to find the right solution to suit your specific needs.

Get In Touch