The Mt Cass Wind Farm is a 94.6 MW renewable energy project under construction near Waipara in North Canterbury, South Island.
Scheduled for completion in 2028, the 22-turbine site will be the largest in the South Island, producing enough clean electricity to power roughly 40,000 homes.
Engineering Challenges
The Mt Cass Wind Farm development presented significant engineering challenges. Turbine platforms, access roads, and associated infrastructure were located mostly on steep, variable terrain, requiring careful geometric, earthworks, and slope stability design.
Consent conditions were aimed at protecting indigenous vegetation and minimising disturbance to those of higher ecological value.
The client required a design solution that balanced constructability and cost efficiency with ecological constraints.