New Bridgewater Bridge – Tasmania
Tasmania’s largest-ever transport infrastructure project – the New Bridgewater Bridge, a 1.28 km, four-lane crossing of the River Derwent that replaces the 1946 steel-truss lift bridge.
Designed to improve safety and reliability for everyone who uses it, the bridge includes a shared walking and cycling path and strengthens the connection between Hobart’s northern suburbs and the Midland Highway.
As lead geotechnical designer, we delivered a foundation solution that helps the bridge perform in a challenging river environment – addressing highly variable ground conditions, seismic hazards, and flood-scour risk.






















